National Report on School Closure Misses Opportunity to Illustrate Moral Dimensions of School Closure

East Lansing, Mich. A report from the Hoover Institution’s Center for Research on Educational Outcomes (CREDO) offered a comprehensive analysis of the impact of closing low-performing schools. The report included data from 1,522 low-performing schools from 26 states. An academic review finds the report to be a valuable addition to the research on school closures.

Matthew Gaertner, SRI International, and Ben Kirshner, University of Colorado Boulder, reviewed the report, Lights Off: Practice and Impact of Closing Low-Performing Schools, for the Think Twice think tank review project. Think Twice, a project of the National Education Policy Center (NEPC), is funded by the Great Lakes Center for Education Research and Practice.

Though the report obscures some of its most important findings, Gaertner and Kirshner describe the report as one of the most comprehensive datasets ever assembled for school closure research. The reviewers note that the study was a careful, rigorous study with some missed opportunities for further analysis.

The original report found:

  1. Schools enrolling higher proportions of minority and low-income students were more likely to be closed;
  2. Test scores declined for students who transferred to schools with lower test-score performance and for students who transferred to schools with equivalent test-score performance; and
  3. Slightly less than half of students transferred to higher performing schools after a closure; those who did showed academic improvement relative to their matched peers.

Gaertner and Kirshner add that the report should have better highlighted the disproportionality of the school closures and the inadequate number of higher quality receiving schools. The reviewers were also concerned about the statistical modeling, which threatens the validity of subgroup analyses (specifically as it relates to charter school comparisons).

In their conclusion, the reviewers say that they would have liked to see the report acknowledge the moral dimensions of school closures: “Decisions about school closure and broader questions of reform raise normative political questions about participation and rights – including questions about the voices of students and their parents.”

Find the review on the GLC website at www.greatlakescenter.org

Featured

  • California High School Starts Construction on STEAM, Music Buildings

    Tamalpais High School, part of the Tamalpais Union High School District, recently broke ground on two new major facilities for its campus in Mill Valley, Calif., according to a news release. The district is partnering with Quattrocchi Kwok Architects (QKA) and Lathrop Construction Associates for the Science Technology, Engineering, Arts, and Mathematics (STEAM) and Music Buildings, both replacing their outdated counterparts.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

Digital Edition