Preparing for Emergencies

Performing drills disrupts the flow of an already-full school day. Without adding more time to the drill, how can schools ensure they are getting the most value from these activities?

Teach staff to initiate the drill. The principal typically announces a drill. But the person most likely to encounter an emergency, like a strange odor or a student with a knife, is actually a staff member. Teaching staff to initiate drills gives them the means and responsibility to help keep students safe.

Use scenarios to put the drill in context. When a real emergency hits, emotion and adrenaline will significantly affect how successfully everyone responds. Scenarios put drills in context and incorporate a level of emotion and adrenaline. For example, the principal hands a 6th grade math teacher the following scenario printed on an index card, “You’re in the middle of teaching a class when you and several students notice smoke and flames coming through the ceiling tiles just over your head. Go!” Now, it’s up to the teacher to respond and alert the building.

Assess the fidelity of your safety plan. In addition to preparing for various emergencies, drills tell you if your safety plan works. We’ve all encountered situations where what looks good on paper doesn’t hold up in a real scenario. Documenting lessons and modifying your safety plan is critical to ensuring a safe learning environment.

Putting drills in context and empowering staff to initiate them improves staff engagement, better preparing everyone to respond effectively during a drill or emergency. It ensures the right safety plan is in place, which is valuable.

This article originally appeared in the issue of .

About the Author

Thom Jones is the general manager of NaviGate Prepared. He can be reached at 740/963-3141.

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Geometric abstract school illustration

    How Design Shapes Learning and Success

    Can the color of a wall, the curve of a chair, or the hum of fluorescent lights really affect how a student learns? More schools are beginning to think so.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

Digital Edition