Students Benefit From Safer Flooring

Ecore

CCA students benefitted from safer, slip-free flooring in their athletic center and the school benefitted from procuring a durable, longer-lasting floor that requires less maintenance over time.

“Everything starts with the flooring,” says Dana Ridenour, director of advancement at Calvary Christian Academy (CCA), a pre-K3–12 school located in Fort Lauderdale, Fla., and committed to excellence in academics, athletics, arts, technology, leadership, and ministry. “Then you can start building and painting; but, you have got to have a great floor first.”

CCA recognized the significance flooring has in a space. So, when CCA renovated its fitness center in the spring of 2017, school leadership listened to the recommendation of Legend Fitness, a fitness equipment manufacturer involved with the project, and specified Ecore Athletic surfacing.

“When I visited the site for the first time, I saw a student trying to push a sled on concrete, and it wouldn’t move,” says Troy Kelley, director of Athletics for Ecore. “It’s impossible to push a sled on that surface. It’s not good for the sled, the athlete or the floor.”

That’s because the surface of the entire fitness center, which is housed inside a former warehouse adjacent to the campus, was concrete. Kelley suggested four surfaces that provide safety, ergonomic and acoustic properties for this 3,774-square-foot space, which is used by more than 200 students and student athletes daily.

CCA had 1,482 square feet of Monster Roll installed in the weight lifting area, which features 14 racks with custom, inlaid platforms for Olympic-style weight lifting. Monster Roll is a 22.5mm system designed to provide the firm footing desired in strength training with the ergonomic demands of aggressive functional training. “It’s going to save us so much on weights and other equipment, because all that stuff is no longer getting banged up,” says Ridenour.

CCA is extremely happy with the outcome of the renovation and all of the surfaces in the fitness center. “We waited a long time to get this project done,” says Ridenour. “The products are just fantastic. For the first time, we have safe and slip-free surfaces.”

www.ecoreintl.com

This article originally appeared in the issue of .

Featured

  • KI Launches K–12 Classroom Furniture Giveaway

    Contract furniture company KI recently announced the launch of its fourth-annual Classroom Furniture Giveaway, which awards $50,000 each to four K–12 educators across the U.S., according to a news release. The goal is to address decreasing student engagement and increasing teacher burnout numbers by updating learning spaces to accommodate modern needs.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • UNL Kiewit Hall

    Designing for Engineering Excellence: Integrating Sustainability and Wellness at UNLs Kiewit Hall

    Kiewit Hall at the University of Nebraska-Lincoln exemplifies how academic institutions can integrate sustainability and wellness into modern learning environments. With an integrated and collaborative team approach, Kiewit Hall addresses enhanced learning and creativity, physical health, and mental wellness, and fosters a sense of community through innovative design, operations, and policy solutions.

Digital Edition