Students Benefit From Safer Flooring

Ecore

CCA students benefitted from safer, slip-free flooring in their athletic center and the school benefitted from procuring a durable, longer-lasting floor that requires less maintenance over time.

“Everything starts with the flooring,” says Dana Ridenour, director of advancement at Calvary Christian Academy (CCA), a pre-K3–12 school located in Fort Lauderdale, Fla., and committed to excellence in academics, athletics, arts, technology, leadership, and ministry. “Then you can start building and painting; but, you have got to have a great floor first.”

CCA recognized the significance flooring has in a space. So, when CCA renovated its fitness center in the spring of 2017, school leadership listened to the recommendation of Legend Fitness, a fitness equipment manufacturer involved with the project, and specified Ecore Athletic surfacing.

“When I visited the site for the first time, I saw a student trying to push a sled on concrete, and it wouldn’t move,” says Troy Kelley, director of Athletics for Ecore. “It’s impossible to push a sled on that surface. It’s not good for the sled, the athlete or the floor.”

That’s because the surface of the entire fitness center, which is housed inside a former warehouse adjacent to the campus, was concrete. Kelley suggested four surfaces that provide safety, ergonomic and acoustic properties for this 3,774-square-foot space, which is used by more than 200 students and student athletes daily.

CCA had 1,482 square feet of Monster Roll installed in the weight lifting area, which features 14 racks with custom, inlaid platforms for Olympic-style weight lifting. Monster Roll is a 22.5mm system designed to provide the firm footing desired in strength training with the ergonomic demands of aggressive functional training. “It’s going to save us so much on weights and other equipment, because all that stuff is no longer getting banged up,” says Ridenour.

CCA is extremely happy with the outcome of the renovation and all of the surfaces in the fitness center. “We waited a long time to get this project done,” says Ridenour. “The products are just fantastic. For the first time, we have safe and slip-free surfaces.”

www.ecoreintl.com

This article originally appeared in the issue of .

Featured

  • Houston K–12 District Opens New Elementary School

    The Lamar Consolidated Independent School District (Lamar CISD) recently announced the completion of a new elementary school in a western suburb of Houston, Texas, according to a news release. Haygood Elementary School measures in at 110,000 square feet, has the capacity for 854 students, and is the first of three new schools scheduled to be built in the Cross Creek West community.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.