Columbia College Chicago Granted Building Permit for Student Center

Columbia College Chicago in Chicago, IL, recently was granted a building permit, and announced it is preparing to begin work on a new student center in Chicago’s South Loop neighborhood. The 114,000-square-foot facility, designed by Gensler, will fill a vacant lot.

The design for the new student center is centered on flexibility, including maker spaces, lofts, labs, and a fitness center and dining commons. The facility will feature a glass façade that allows occupants to look out and interact with the community surrounding it.

Columbia College Chicago Granted Building Permit for Student Center

With a groundbreaking held this past November, the center is targeting a completion date of early 2019.

Featured

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

  • Countway Library at Harvard Medical School

    From Shadows to Sanctuary: The Transformation of Light at Countway Library

    The renovation of Countway Library at Harvard Medical School demonstrates how biophilic design and advanced lighting strategies transformed a formerly dark, insular space into a vibrant, welcoming hub that supports wellness, learning, and community engagement.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition