Pinellas Technical High School Construction Underway

JE Dunn Construction is transforming a career and technical education center built 57 years ago into the first full-time technical high school for Pinellas County Schools in Florida.

Pinellas Technical High School

The $13.2-million project establishing the Pinellas Technical High School at Seminole involves constructing a 34,335-square-foot, two-story building with classrooms, administrative offices and kitchen and cafeteria areas; renovating 26,250-square-foot of existing classroom and administration building; and making site improvements to the 42-acre campus, established in 1961.

The new “Tech High” will accommodate enrollment growth and, with its new full-day schedule of classes, augment the curriculum to include the full spectrum of courses students need to graduate from high school as well as honors and advanced placement classes. The school’s technical offerings will be: building trades and construction design technology, commercial and digital arts, electricity, nursing, veterinary assisting, and game or simulation programming.

The new facility—which will replace the Career Academies of Seminole—is scheduled to open August 2018.

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

Digital Edition