Washington University: Francis Field House

Washington University

PHOTOS © HASTINGS+CHIVETTA ARCHITECTS, INC. / FENTRESS PHOTOGRAPHY

Washington University’s historic Francis Field House has been transformed by Hastings+Chivetta Architects and Bohlin Cywinski Jackson into a 21st-century fitness, athletic, and recreation center. Built in 1902, Francis Field House is a registered historical landmark and was the site of the 1904 Olympic Games. The new LEED Gold Gary M. Sumers Recreation Center, created through an addition and renovation to the Field House, is an innovative facility that honors its historic legacy.

The original entry to the Field House was restored as the main access point from the expanded facility. All floors in the “head house” were removed, creating a multi-story space through which a 16-foot-long bridge, surfaced with hardwood salvaged from the original gymnasium floor, connects old and new and serves as the primary control point for day-to-day users. A multi-story fitness center is the heart of the plan, surrounded by multipurpose lounge and support spaces, with direct access to all other components of the facility. A new three-court gymnasium with track was added to the south with athletic locker rooms and meeting and training spaces below.

Floor-to-ceiling windows, skylights, and clerestories provide ample daylight that permeates the facility. Articulated wood surfaces with reveals between panels are a subtle and sophisticated incorporation of the university’s red color. A dramatic art installation covers the interior entrance wall. The recreation gym features the largest stained wood gym floor in the Midwest, which celebrates the significant history and location of the university in St Louis, MO.

Both the new addition and a 1980s Athletic Complex addition were wrapped in a glass-enclosed colonnade featuring masonry piers capped with Indiana limestone and aluminum panel details, thus preserving the architectural and visual integrity of the original Field House.

This article originally appeared in the College Planning & Management May 2018 issue of Spaces4Learning.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.