Zoned Technology Leads to Lower Electric Bills

Misubishi

With Zoned Comfort Solutions from Mitsubishi Electric, St. Joseph’s no longer fears high electrical bills and is able to offer students and teachers a comfortable learning environment year-round.

After many years running on an outdated boiler system and noisy AC units, St. Joseph School, in Pilot Grove, Mo., needed to find an HVAC system that could efficiently cool and heat the 5,400-square-foot building without disrupting day-to-day activities. The solution: Zoned Comfort Solutions from Mitsubishi Electric Cooling & Heating.

With these needs in mind, the school worked with Jamie Callahan of Air and Water Solutions. Callahan believed there was only one solution for St. Joseph’s—zoned technology, and he recommended Zoned Comfort Solutions from Mitsubishi Electric as the brand for the school to install. He said, “The school didn’t want to reuse the gas boiler, and with the energy efficiency of Mitsubishi Electric units, it was the only option.”

The installation took only two weeks and Callahan has received nothing but positive feedback from the school, specifically with the system’s ability to offer cost savings. He said, “From what I’ve heard, the school went from paying thousand dollar electric bills to paying $245 a month. That’s nearly 25 percent of the original cost.”

The staff agrees that the experience has been great. Principal Nichole Watring said, “We have not had any issues with the system and the teachers and students love that they can control the temperature of their rooms. It’s much quieter and more efficient than the previous system.”

The school was also pleased with the system’s appearance. School Manager Donna Gerke said, “We looked for a system that offered more cost savings and efficiency but aesthetics was an added bonus. It’s given the school a whole new look on the inside. It looks fresher and cleaner.”

With Zoned Comfort Solutions from Mitsubishi Electric, St. Joseph’s no longer fears high electrical bills and is able to offer students and teachers a comfortable learning environment year-round.

www.mitsubishicomfort.com

This article originally appeared in the School Planning & Management June 2018 issue of Spaces4Learning.

Featured

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Designing School Spaces for A++ Performance

    In recent years, the educational world has gained greater appreciation for the ways a space’s aesthetics, just like its acoustics, can positively impact educational outcomes. Consequently, engineering, designing, and constructing a school environment demands acoustics to be equally an art and a science, requiring architects and designers to see with their ears, while acousticians must hear with their eyes.

Digital Edition