Open But Secure

Located in one of the toughest areas in South Central Los Angeles the Animo South Los Angeles High School, a new public charter high school for 630 students, is visually open but entirely secured. The area was a central trouble spot during the 1964 Watts and the 1992 Rodney King Riots. Fair Housing and school busing has plagued the area since the early 60s, where median family income is less than $35,000/year and 25 percent of the population lives below the poverty level.

On July 22, 2014, a massive fire broke out and destroyed half of the campus. This new replacement building contains 11 classrooms, two science labs, faculty lounge, new administrative and counseling offices, and public courtyard space for student gatherings and activities.

South Los Angeles High is a progressive, public charter high school known for its collaborative, curriculum and strong community connection. This building and addition to the 1950s campus creates a flexible teaching environment that supports significant parental involvement and puts student life at the center of the school and unites the campus community.

Designed on an extremely limited budget and aggressive schedule, simple cost-effective gestures were deployed in the use of cladding, fenestration, color and transparency to create a memorable sense of richness, providing a bright moment in an extremely tough inner-city community.

Unlike most school that are enclosed by a property line security fence, the South Los Angeles High School building is surrounded by a 20-foot-high perforated bullet-resistant metal walls that are integrated into the building design. This creates light filled courtyards for outside activity that is connected directly to classroom activities. This arrangement of courtyard design allows the building to breathe fresh air and daylight while providing a safe and secure environment for leaning and social engagement. Open-air light-filled halls and classrooms, as well as the building transparency, express the school’s values and provide a healthy, sustainable learning environment. The building form and primary courtyard are formed by a series of required clearances around an oil well abandoned in the late 1970s, a series of power line and utility easements, height restrictions, and zone changes running through the site that constrain the form and size to its maximum possible building-area envelope.

The perforated anodized aluminum façade panels of the building create an ever-changing screen that sparkles in the sun and glows at night, while simultaneously providing shade to cool the building, reducing noise, enhancing privacy, and still allowing for views, great natural light, and ventilation that pass through its millions of perforations. The material reappears as a strategic arrangement of screens around the building, lending a subtle rhythm to the exterior circulation. The walls filter direct sunlight that lends unexpected visual depth while creating a sense of security for the occupants. Enhancing the structure’s geometric texture, the irregular array of openings variably extrudes from the building’s surface. Its unique architectural form and integrated function creates a high-performing building that is an expression of the people who live there and the environmental and cultural context in which it is built.

The cost of the 18,000 square-foot project was $3,300,000.00. Brooks + Scarpa served as the lead architectural firm. Franco + Associates served as associate architect. Construction was done by Blackwell Construction, Inc.

Featured

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Designing School Spaces for A++ Performance

    In recent years, the educational world has gained greater appreciation for the ways a space’s aesthetics, just like its acoustics, can positively impact educational outcomes. Consequently, engineering, designing, and constructing a school environment demands acoustics to be equally an art and a science, requiring architects and designers to see with their ears, while acousticians must hear with their eyes.

Digital Edition