New Interdisciplinary Science and Engineering Building at University of California, Irvine

LMN Architects announces the groundbreaking of the new Interdisciplinary Science and Engineering Building at the University of California, Irvine (UCI). The Interdisciplinary Science and Engineering Building (ISEB) serves UCI’s Henry Samueli School of Engineering, the Donald Bren School of Information & Computer Science, and the School of Physical Sciences.

UC Irvine

Inspired by the university’s commitment to interdisciplinary science and engineering research and its potential to solve the challenges of today and the future, the building is conceived as a catalyst for research innovation as well as a new model of cross-disciplinary collaboration. The six-story, 204,750-gross-square-foot facility will set a new standard for the future of research programs at UCI. Every aspect of the building’s design is conceived to optimize research functionality, foster social performance, and enrich the overall campus experience.

Each façade of the building responds to its specific environmental conditions, optimizing daylighting, internal comfort, and energy efficiency. The building features a combination of materials that are tuned to the specific environmental conditions, including enhanced clarity low-iron glass, sculptural precast concrete panels, and metal cladding and fins. Indoor-outdoor relationships will be achieved through design strategies that capitalize on the unique, temperate climate and natural beauty of the campus. The project is targeting LEED Platinum certification.

Featured

  • Florida District Selects Designer for K–8 Prototype Campus

    St. Lucie Public Schools in St. Lucie, Fla., recently announced that it has selected Spiezle Architectural Group, Inc., to design its new Western Grove K–8 prototype campus, according to a news release. Construction on the 217,500-square-foot facility will begin in February 2025 and is scheduled for completion in August 2026.

  • Minnesota K–12 District Completes New Elementary School

    Rock Ridge Public Schools in Virginia, Minn., recently announced that construction of the district’s newest elementary school is complete. North Star Elementary cost $28.5 million and has the capacity for 600 students in grades 3–6, according to a news release.

  • college student sitting at a desk, studying on a glowing laptop with geometric shapes representing technology in the background

    Pearson Introduces New AI-Powered Study Tools

    Digital learning company Pearson has launched several new AI-powered tools to help provide students personalized help from within their e-textbooks or study platforms.

  • San Diego High School Hits Construction Milestone

    Part of a whole-site modernization project at Mira Mesa High School in San Diego, Calif., recently reached a construction milestone. The final steel beam of the new classroom and student services facility was put into place, completing the building’s structural framework.

Digital Edition