Newly Renovated, Energy-Efficient School Opens for Sixth Grade Class

The newly renovated Gibbs School opened in September to accommodate the sixth-grade class, and a ribbon-cutting took place on Sunday October 21st. Finegold Alexander Architects served as the architect of record for the project, NV5 was Owner’s Project Manager, and Shawmut Design and Construction was Construction Manager.

Gibbs School

“The Town of Arlington is excited to complete the renovation and open the Gibbs School,” said Kristin DeFrancisco, Gibbs School Principal. “We are thrilled to be able to provide a school building that was carefully designed to meet the academic and social emotional needs of the sixth graders in Arlington, while being cost-effective and efficient.” Finegold Alexander Architects worked closely with the Arlington Permanent Town Building Committee; Superintendent, Kathleen Bodie; Gibbs School Principal, Kristin DeFrancisco; and Director of Facilities, Steve Nesterak to ensure the design reached these goals.

The 69,000-square-foot Gibbs building was originally built as a school in 1928.  It was renovated and a new addition was added in 1973. The school was de-commissioned approximately 25 years ago due to a decrease in enrollment, and then was leased to non-profit organizations, including the Lesley Ellis School and the Arlington Center for the Arts.  

“The goal was to create a welcoming environment that would inspire students to seek opportunities for learning,” said Regan Shields Ives, Principal, Finegold Alexander, who served as Project Manager. “The result is a flexible, engaging learning environment that is also highly energy efficient.” The project is on track to achieve LEED Silver V4 for Schools.

The renovation created flexible classrooms, as well as breakout collaborative spaces in the corridors fit out with technology and seating to allow for smaller group learning. There is a new, redefined main entrance and canopy on the Foster Street side of the school, designed to create a warm, safe and inviting approach. A Media Center was created in the former original Auditorium to create flexible learning clusters with group meeting tables, individual work spaces, and a mezzanine large enough to accommodate a full class of students.  

“This design was truly inspired by how students learn and what they need in today’s learning environment,” said Tony Hsiao, Principal, Finegold Alexander. “The design required creative thinking to work within the boundaries of the existing building envelope. The result is spectacular, a place to motivate students and teachers alike to reach for excellence in education.”

The first floor contains a cafeteria, language classrooms, flexible theatre space, music classroom, technology lab, and administration offices. The second floor consists of two clusters of four classrooms with breakout spaces, a gymnasium, art studio, digital media lab, and media center. The third floor includes another two clusters of classrooms with breakout spaces. There is also an outdoor classroom, community garden space, and rubber play surface for recess. The parking lot now includes two electric car charging stations.

For more information, visit www.faainc.com.

Featured

  • Kimball Showroom Earns WELL Certified Platinum Distinction

    Commercial furnishings company Kimball International recently announced that its showroom in New York City has achieved WELL Certification at the Platinum level as dictated by the International WELL Building Institute, according to a news release. The certification demonstrates a continuing commitment to creating environments that promote health, well-being, and productivity.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Midland ISD Starts Construction on Two New High Schools

    The Midland Independent School District recently announced that it will break ground on two new high schools in Midland, Texas, according to a news release. The district is partnering with Pfluger Architects, Lee Lewis Construction, and Satterfield & Pontikes to create a total of over 1.5 million square feet for 8,400 students in grades 9–12.

  • Enjoy Tax and Energy Savings with the Right Ceiling Solutions

    Thanks to recent innovations pairing mineral fiber ceiling panels with phase change material technology (PCM), architects, designers, facility managers, and other key players in construction and renovation projects are re-thinking the role ceilings play in supporting environmental objectives—especially energy savings.

Digital Edition