New Facility for Mathematics at Missouri Southern State University

A dedication and ribbon cutting ceremony for Jeremiah “Jay” Nixon Hall will be held  on January 31, inside the newest addition to Missouri Southern State University’s campus in Joplin, MO.

A little more than two years after breaking ground, the $8.1-million, 21,000-square-foot facility was up and running for the beginning of the Spring 2019 semester just as planned.

Facility for Mathematics at Missouri Southern State University

Named for a former Missouri governor, Nixon Hall is the new home for the university’s mathematics program and features classrooms, lecture halls, faculty offices, a computer lab, and mathematically themed interior design elements. Nixon Hall is designed to facilitate collaboration between students and faculty through the use of different types of collaboration spaces of various sizes. Each lecture hall is flexible in that two lecture halls can open up to be one large lecture hall space for large educational groups.

It also includes a three-story atrium and a skywalk that connects the facility to the second floor of the recently renovated Reynolds Hall—something that makes the trip back and forth more expedient for STEM (science, technology, engineering and math) students.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.