U.S. Military Academy at West Point: Pershing Barracks

military school at west point

TOP RIGHT TWO PHOTOS © BRENDAN MCGIBNEY PHOTOGRAPHY, TOP LEFT AND BOTTOM PHOTOS COURTESY OF KOKOLAKIS CONTRACTING

Pershing barracks, located at the U.S. Military Academy at West Point in West Point, NY, was originally constructed for academic purposes from 1891 to 1895. This historic structure is significant for its architecture, which incorporates elements of Gothic, Tudor, and Romanesque styles, and for its association with the infamous architect Richard Morris Hunt. Kokolakis Contracting’s commitment to preserve the historic integrity of this building was top priority during the preservation process and while updating the infrastructure to a modern state-of-the-art facility.

The 124,692-square-foot, four-story cadet housing facility involved complex upgrades to meet current codes and achieve LEED Silver certification. Energy-efficient features include exterior wall spray-foam insulation; insulated windows; electronic controls for heating, ventilation, and air conditioning (HVAC); LED lighting; and low-flow plumbing fixtures. The HVAC upgrade was especially challenging since the building did not originally have systems in place. As a building that was first completed in 1895, its structural layouts were not configured with ample space or passageways for modern building systems.

Structural flooring consists of terracotta masonry archways that span between floor beams as low as 7 feet/7 inches, with 60-inch-thick structural brick masonry walls located throughout the floors. As a result, the MEP coordination was one of the largest challenges on the project. Using Building Information Modeling (BIM), the ductwork, piping, and conduit were laid out in a manner to reduce challenges and conflicts.

Another historic preservation aspect was restoring the two faces of the clock tower. The inner workings, which have not been operable for some time, will be replaced with a new electric model. The clock tower’s missing gargoyle will also be returned to his proper location at the top of the clock tower.

The newly renovated Pershing Barracks was completed at the end of 2018, ultimately accommodating 270 cadets and six officers.

This article originally appeared in the College Planning & Management March 2019 issue of Spaces4Learning.

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • Colorado State University Global, SCTE Launch Online Certificate Program

    Colorado State University Global (CSU Global), based in Denver, Colo., recently announced a partnership with CableLabs subsidiary the Society of Cable Telecommunications Engineers (SCTE) to launch an online certificate training program for broadband professionals, according to a news release.

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition