Construction on Another New School in Chesterfield Breaks Ground

Chesterfield County (Va.) Schools broke ground on a new school in the Matoaca District. It’s the seventh such groundbreaking of a new elementary school in the past two years.

Chesterfield School“Look over my shoulder and you see the white balloons? There’s the front door Mary, of your brand new school,” said School Board Chair Rob Thompson gesturing to Matoaca Elementary School Principal Mary Thrift. The new school is replacing one that is over 80-years old. It’s being built on the same site as the Matoaca Middle School west Campus. Besides the previous seven elementary schools, four more are on the docket to be built in the coming year. Those include Crestwood, Ettrick, Harrowgate and Reams. By the end of the construction plan, each magisterial district will have at least one new elementary school within its borders.

All the new school construction is part of the 2013 School Bond Referendum. That $304-million bond allowed either renovation or construction of new schools. The school board hopes to draft a new bond referendum for 2020. According to Deputy County Administrator for Finance Matt Harris, early estimates have that bond at $230 million.

The new Matoaca Elementary school is scheduled to house over 700 students and open in Fall of 2020.

 

 

Featured

  • concentric silhouettes of a human head

    How Physical Space Shapes the Mind: Designing for Better Learning Outcomes

    Research in environmental psychology and neuroscience increasingly suggests that the way a room is designed can influence memory, focus, or even a student's sense of belonging.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition