University of Pennsylvania Reveals Plans for New Facility

PHILADELPHIA, PA – The University of Pennsylvania (Penn) has released architectural renderings of the design for the transformative Tangen Hall. The new building will be Penn’s first dedicated space for cross-campus student entrepreneurship and innovation activity.

University of Pennsylvania Tangen Hall

Developed by the Hankin Group, KSS Architects’ design for Tangen Hall sets up each floor with a destination program. A façade of precast concrete and shades of green glass will offer a transparent view into the innovation culture at Penn. The project uses sustainable materials and is designed to meet Penn’s LEED Silver target.

Supporting student entrepreneurship and innovation, the seven-story, 68,000-square-foot building will be one of the largest hubs of its kind on any college campus. It will include incubator spaces and maker spaces to pilot student-led ventures, a test kitchen for food-centric startups, and the master’s level Integrated Product Design Program jointly operated by Wharton, the School of Engineering and Applied Science, and the Stuart Weitzman School of Design. Tangen Hall will also be home to the new Venture Lab, where students from across Penn’s 12 schools can turn good ideas into great outcomes.

Construction of Tangen Hall is slated to begin in spring 2019 and be completed by fall 2020.

Featured

  • Preparing for the Next Era of Healthcare Education, Innovation

    Across the country, public universities and community colleges are accelerating investments in healthcare education facilities as part of a broader strategy to address workforce shortages, modernize outdated infrastructure, and expand clinical training capacity. These projects, which are often located at the center of campus health and science districts, are no longer limited to traditional classrooms.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • abstract representation of hybrid learning environment

    The Permanence of Change: Why Hybrid Is the New Baseline

    Hybrid learning is here to stay, and it's reshaping how campus spaces function.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.