$36M Athletics Complex Underway at Orange Coast College

COSTA MESA, CA – Groundbreaking recently took place on the $36 million Orange Coast College (OCC) Kinesiology and Athletics Complex in Costa Mesa, CA. The three-building, 88,000-square-foot complex is one part of a broader project to revitalize and modernize OCC’s campus.

Orange Coast College

Rendering courtesy of Little Diversified Architectural Consulting

Construction for the complex, by C. W. Driver, will occur in two phases. The first phase includes new construction of a multi-building, one-story complex spanning 58,000 square feet. Phase II will focus on the renovation of the existing 30,000-square-foot building that houses the men’s and women’s locker rooms and existing pool areas.

Upon delivery, the complex will feature division offices, athletic training, adaptive physical education, equipment management, locker rooms/showers, support spaces for the aquatics programs, a 65-meter competition pool with double bulkheads, a 25-meter instructional pool, and a 450-person bleacher space covered by a canopy. The buildings will be interconnected by an overhead shade structure.

Project partners include Little Diversified Architectural Consulting.

Featured

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • UT System Approves First Funds for New Campus

    The University of Texas System Board of Regents recently approved funds to build the first facility of a new campus in far west Fort Worth, Texas, according to university news. UTA West will serve as a branch of the University of Texas at Arlington and is scheduled to open in fall 2028.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.