New Texas Middle School Emphasizes Openness, Flexibility

A Texas district recently opened its sixth middle school. Marine Creek Middle School, part of Eagle Mountain-Saginaw Independent School District, consists of a two-story, 165,000 square-foot campus, serving students in grades 6-8.

A Texas district recently opened its sixth middle school. Marine Creek Middle School, part of Eagle Mountain-Saginaw Independent School District, consists of a two-story, 165,000 square-foot campus, serving students in grades 6-8.

The architectural design, by Texas-based VLK Architects, uses non-traditional classrooms and science labs with flexible furnishings and movable tables with frosted glass serving as writable surfaces to create student collaboration spaces. The media center sports an open-access, multi-functional space with wireless technology throughout, including a large-format video wall for large-group instruction. A "think tank" area overlooking the library provides a glass-walled space where students are encouraged to collaborate, while still allowing teachers to oversee activities. An outdoor learning courtyard was designed to help bridge the gap between academics and the social and emotional well-being of students.

District stakeholders, including school leaders, teachers, students and families, told designers during its planning phases that they wanted to incorporate an architecture style true to Texas. That translated to ample transparency for connecting interior and exterior spaces, the optimization of natural light for instructional areas and use of outdoor learning environments.

A "think tank" area overlooking the library provides a glass-walled space where students are encouraged to collaborate, while still allowing teachers to oversee activities.

Just west of the campus is a walkway to the outdoor recreation area surrounding Marine Creek Lake, which is operated by the local water district. Eventually the district expects to extend the walkways to the lake and an associated trail system, which will eventually connect into the Trinity Trails in central Fort Worth.

"The vision of the school was focused on collaboration, efficiencies, safety, and quality instructional spaces," said Superintendent Jim Chadwell, in a statement. "It's certainly a beautiful facility and, as nice as all of the aesthetic comments are, a school is first and foremost designed for learning. We have created the framework for excellence to happen in this building and now we are excited to see the students and staff build on that framework for success."

The first day of classes at the school was Aug. 19.

Marine Creek Middle School administrative staff includes Principal Danny Knowles, Assistant Principal Christie Warden and Assistant Principal Whitney Wheeler.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • CSU Pueblo Installs Solar-Powered Charging Benches

    Colorado State University Pueblo (CSU Pueblo) recently announced that it has installed four solar-powered charging benches from Bluebolt Outdoor, LLC, according to a news release.

  • DLR Group Hires Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that Senior Associate Megan Todd will serve as its new Higher Education Business Development Leader, according to a news release. Her responsibilities will include building the firm’s reach and client relationships in the California higher education sector, based out of San Diego.

  • California District Starts Construction on New Robotics Facility

    The Fremont Union High School District (FUHSD) near Silicon Valley, Calif., recently announced that construction has begun on a new Robotics Facility on the campus of Cupertino High School, according to a news release. The 14,500-square-foot facility will serve students at high schools across the entire district, providing purpose-built spaces for student creativity and collaboration.

Digital Edition