Michigan High School Designed to Protect Students from Mass Shootings

With the high frequency of mass shootings in the United States, Fruitport School District administrators had campus safety on their mind when designing new sections of Fruitport High School in Michigan. The $48 million project will include curved hallways and extra layers of protection for students, teachers and staff in the event of a shooting.  

Construction for the high school is ongoing and include major renovations to the existing building and adding new sections with safety features. The curved hallways reduce the range of an active shooter — meaning they won’t be able to see the entire length of the hallway. Cement blocks jutting out along the hallway provide cover to students and allow them to seek refuge within a classroom.

“If I go to FPH and I want to be an active shooter, I’m going in knowing I have reduced sightlines,” Fruitport Superintendent Bob Szymoniak told the Washington Post. “It has reduced his ability to do harm.”

Inside the classrooms, students are able to hide along a side wall known as the “shadow zone,” where they can’t be seen by a gunman from the hallway.

Inside the classrooms, students are able to hide along a side wall known as the “shadow zone,” where they can’t be seen by a gunman from the hallway. Impact resistant film will go on all classroom windows in the new high school. The school plans to implement access control locks in every classroom which gives school leaders the ability to lock down the entire school with the push of a button.

By adding layers of safety it will buy students, teachers and staff time as police respond to the scene, Szymoniak told a local news station.

Matt Slagle, an architect for the project and director of K-12 projects at the TowerPinkster design firm, told the Washington Post he wanted to create a welcoming environment for students without compromising campus security.

Construction for the entire project is expected to finish in 2021. Fruitport School District students go back to school on Sept. 3.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

Digital Edition