Michigan SD Upgrades Security with Police Grant

Pontiac School District was awarded a more than $130,000 grant from the Michigan State Police to help upgrade security on their campuses.

The $132,545 grant will be used to install 102 new security cameras throughout the district, with 48 being installed at Pontiac High School.

The new cameras offer a high-definition 360-degree view and will replace older models at the schools. The last time cameras were replaced was in 2016.

“In schools, it’s all about building rings of security, from our windows and doors to finding additional funding like this for prevention and detection,” Jeff Mozdzierz, technology director for the district, told a local newspaper. “We’re always looking to build additional layers of security.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Spaces4Learning Announces Winners of 2025 Product Awards

    Spaces4Learning has just announced the winners of the 2025 Product Awards! The award program recognizes innovation and excellence in products that enhance learning environments in K–12 schools and institutions of higher education.

  • Ryan Companies Completes Construction on Three U.S. Charter Schools

    Ryan Companies US, Inc., recently partnered with Red Apple Development (RAD) and Charter Schools USA (CSUSA) to build three new charter schools in South Carolina and Louisiana, according to a news release. Ryan served as general contractor with RAD as the developer of record.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition