Dayton Elementary Opens New Makerspace

Dayton Elementary School in Indiana gained a new makerspace so students have a more hands-on learning experience in science, technology, engineering, art and math.

Tippecanoe School Corporation partnered with Indiana Next Generation Manufacturing Competitiveness Center at Purdue University to create the lab.

The Dayton Elementary makerspace features 3D printers, two Dobot Magician robotic arms from STEM Education Works and SDI Innovations, a green screen and robotic balls called Sphero.

“It brings real world application to concepts that are being taught,” third grade teacher Elizabeth Miller said. “For example, when learning about angles, programming a Sphero ball to move at different angles brings this concept to life for students.”

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition