Wall Heaters

Blustery days with chilling winds can cause heating problems in many facilities with high volumes of foot traffic. While the main rooms within the building may be warm from the primary heating source, many areas are left out in the cold as drafts bring the temperatures down. Vestibules, lobbies, entrance ways, and hallways can see a steady flow of people moving in and out throughout the day, opening doors and letting in chilly air.

In addition to open doors, cold air manages to find its way into facilities by any means necessary—whether it’s through vents, cracks, crevices or unsealed windows. To counteract these cold drafts, facilities should consider fan-forced wall heaters that provide continuous comfort through optimized airflow. Gentle heating sources are often not powerful enough to provide sufficient warmth in drafty areas. Fan-forced wall heaters however, push back on the infiltrating cold air, ensuring occupants feel the warmth as soon as they enter the building and until the moment they leave. These heating units can stop the drafts before they spread throughout a building, bringing down temperatures and reducing overall heating efficiency.

Fan-forced wall heaters with an automatic delay eliminate cold drafts on start-up and discharge residual heat from the heater body during shut down. This helps attack drafts at their source while making the best use of available heat. In addition, consider fan-forced wall heaters that come with an integrated thermostat allowing for easy adjustment of room temperature to maintain a desired comfort level.

As with any heating unit, it is imperative to select high-quality products that offer protection against common safety risks. In terms of general design, fan-forced wall heaters come with a clear, easily accessible power on/off switch for added safety during maintenance.

This article originally appeared in the College Planning & Management October 2019 issue of Spaces4Learning.

About the Author

Andrew Martin is a product manager at Marley Engineered Products (www.marleymep.com), based in Bennettsville, SC.

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • California Boarding School Opens New Inquiry Collaborative Facility

    Cate School, a boarding school in Carpinteria, Calif., for students grades 9–12, recently announced that it has finished renovating a historic dining hall into a new academic hub, according to a news release. The school partnered with Blackbird Architects and Tangram Interiors on the two-story, 16,000-square-foot Inquiry Collaborative.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

  • Longwood University Selects Builder for $73M Performing Arts Center

    Longwood University in Farmville, Va., recently announced that it has selected Swedish construction company Skanska as the builder of its new performing arts center, according to online news. The project involves the demolition of the current building and constructing a new, 64,500-square-foot facility.