Minnesota Schools Secure Entrances with State Safety Grants

Minnesota awarded $25 million in safety grants to 123 school buildings last fall, reported the MinnPost. The funding came out of last year’s state legislative session in response to safety concerns after the Parkland, Florida school shooting.

Since the Minnesota Department of Education received a high volume of applications (more than 1,150), the state decided to prioritize applications that focused on entrance and emergency communications upgrades. The state made final selections through a lottery system. No school got more than $500,000.

Here’s a brief look at how Minnesota schools used the grants awarded last fall:

Delano High School: The high school created a new secure entrance, added traffic barriers outside of the front door to prevent a vehicle from crashing through and renovated the administrative wing of the building. Visitors are now expected to walk into a vestibule then through a side door that leads to the front desk, where their driver’s license is screened and vetted before being able to gain access to the building.

Columbia Heights Public Schools: Construction has not started at two school sites that received funding but once renovations are complete, they will have an upgraded front entrance system like Delano schools.

Goodhue Public Schools: Almost all of the funding the district received will go toward upgrading the main school building with a secure entrance.

Chisholm Public Schools: One school located in the Iron Range will get a complete front office redesign, a new intercom system and the addition of a few security cameras.  

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition