Orange Coast College Language Arts and Social Science Building Breaks Ground

COSTA MESA, CA – A recent groundbreaking took place for Orange Coast College’s (OCC) new $50-million Language Arts and Social Science Building. The three-story, 107,760-square-foot building is part of a larger initiative to modernize the campus and accommodate its rapidly expanding enrollment. It is expected to be complete in summer 2021.

Orange Coast College Language Arts Building

The Language Arts and Social Science Building’s first floor will house classrooms, labs, an English as a Second Language (ESL) computer lab and room, facilities for the Speech, Debate and Theater Team and a journalism newsroom. The second floor will be comprised of classrooms and connect to the existing Mathematics Business and Computer Center Building, while the third floor will encompass division and faculty offices. The building also will feature two elevators, a lactation room and gender-neutral restrooms on every floor.

The building is financed through a combination of funding from California Proposition 51 and Measure M, a $698-million general obligation bond provided to construct education facilities for Coast Community College District.

C.W. Driver is partnering with tBP Architecture on the project.

Featured

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.