Wisconsin HS Renovation Features Wire Mesh Infill Panels

Superior High School in Superior, Wisconsin recently completed a $60-million renovation and expansion project which includes classrooms, offices, common area, gymnasium, library media center, and cafeteria space. LHB provided architecture and engineering services and Kraus-Anderson Construction provided construction management services.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications. The three-story facility specifically utilizes Banker Wire’s M13Z-7 framed in Banker’s Versatile Spine.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications.

M13Z-7 is “a rigid cable and intercrimp hybrid wire mesh pattern that maximizes the percent open area by using a set of three intercrimp fill wires.” This provides a durable railing infill panel that offers safety and security while also giving greater visibility between the large stair landings which look down to the common spaces.

The 333,606-square-foot high school includes the addition of railing infill panels made by Banker Wire, a manufacturer of woven and welded wire mesh for architectural and industrial applications.

“LHB selected M13Z-7 to be utilized as an architectural feature material on the grand stairway at Superior High School,” said Anne Porter, Interior Design Project Manager, LHB. “Banker Wire’s M13Z-7 was framed with the company’s Versatile Spine to provide a finished element. These decorative panels were then mounted to the railing structure to provide an industrial aesthetic while also achieving code requirements. Banker Wire was selected due to its product’s durability that required no added finishing and was prefabricated off site.”

Both M13Z-7 wire mesh and Verstile Spine framing were manufactured in stainless steel.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • Minnesota Middle School Finishes $23.5M Addition and Modernization

    Highland Park Middle School in St. Paul, Minn., recently announced the completion of a $23.5-million addition and remodel project, according to a news release. Saint Paul Public Schools partnered with ATS&R Planners, Architects & Engineers for its design and Kraus-Anderson for its construction.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Hawaii Elementary School Breaks Ground on New Classroom Building

    Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.