Boise State Opens Center for the Visual Arts

BOISE, ID – Boise State University recently celebrated the grand opening of the Center for the Visual Arts on its flagship campus in Boise, fulfilling a strategic vision to create a world-class destination arts center serving students and community members regionally and nationally.

Designed by HGA of Minneapolis and Lombard / Conrad Architects of Boise, the Center for the Visual Arts is prominently located on the west side of campus on Capitol Boulevard overlooking the Boise River and downtown skyline, positioned as a campus gateway that connects with the Idaho State Capitol Building, Historic Boise Depot, and the city’s many surrounding civic and cultural buildings.

Boise State Center for the Visual Arts

From the outset, the University envisioned the Center for the Visual Arts as a pivotal cultural link between the campus and the city to elevate its regional and national profile. Consolidating the 2D and 3D visual arts disciplines once scattered throughout campus, the design welcomes students as they head to class as well as community members passing by on Capitol Boulevard. The design evolved from a highly interactive pre-design and planning process involving visual arts professors, administrators, arts patrons, student representatives and other campus and community stakeholders who shared visions for the building. Early conceptual designs changed through subsequent iterations into a sculptural architectural expression that met the University’s vision for a world-class destination on par with facilities at leading institutions.

The 97,600-square-foot building includes a five-story studio, classrooms and office wing; a two-story exhibition gallery wing; and a two-story atrium that connects the two wings.

The five-story north wing contains artist studios, work spaces, and classrooms on four levels. The first level includes ceramics and sculpture suites with common access to an exterior work yard and ceramics kiln. The second level accommodates printmaking and metal work; the third level photography, graphic arts and art history; and the fourth level drawing, painting and art foundations.

The angular studio wing is clad in ¼-inch limestone veneer on flexible honeycomb panels that allow the façade to curve with the building form, while floor-to-ceiling windows provide artist studios with evenly diffused northerly light and views to the mountainous landscape beyond.

The exhibition gallery features visually dynamic blue stainless-steel tiles with a variegated surface that reflects the changing daylight from hour to hour and season to season.

Featured

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

Digital Edition