College Presidents Say a Fall Opening Is Likely, According to Survey

A majority of college presidents surveyed by the American Council of Education say a fall opening is likely.

The survey is the second of a 12-month Pulse Point surveys of college and university presidents on COVID-19. Three-hundred and ten presidents responded to the survey on topics such as “their current plans for the fall, including actions they may require to consider reopening campus, the impact of the pandemic on future revenue, and the projected impact on fall enrollment numbers.”

More than half of college presidents (53 percent) said it’s “very likely” their institutions would resume in-person classes for at least some portion of the fall term, and another 31 percent reported it was “somewhat likely,” according to the survey of 310 presidents.

Of the 230 presidents in the survey whose institutions offered on-campus housing, a little over half (51 percent) say it was “very likely” that they would resume on-campus housing for at least some portion in the fall and nearly 40 percent reported it was “somewhat likely.”

The presidents also weighed in on the actions they’re planning to take in order to resume in-person classes and on-campus operations. Sixty-five percent of presidents of institutions with on-campus housing reported they plan to “establish residential space on campus for individuals who test positive to quarantine.” About half of presidents reported they’re planning to “require masks to be worn on campus” (53 percent) and “provide PPE to faculty and staff” (48 percent).

To read more about the survey results and insights, head over to the American Council of Education.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Texas State University Completes Stadium Renovations

    Texas State University in San Marcos, Texas, recently announced that it has completed a series of additions and renovations to its football stadium, according to a news release. Formerly known as the Bobcat Stadium End Zone Complex, the Johnny and Nathali Weisman Football Performance Center is an 85,000-square-foot expansion featuring hospitality spaces, banquet spaces, exterior concourses, and upgrades to the field house.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition