UCSD Forges Ahead on Two "Neighborhood" Projects

While the University of California San Diego has put some projects on hold due to financial constraints introduced by the pandemic, the university is forging ahead with construction work on its North Torrey Pines Living and Learning Neighborhood and planning for its Future College Living and Learning Neighborhood.

Rendering of North Torrey Pines

The first, the North Torrey Pines site, is a 10-acre "neighborhood" that will become the new home of the university's Sixth College and two new academic buildings, one for the Division of Social Sciences and another for the Division of Arts and Humanities. That campus will have 995,000 square feet of classrooms, recreation, lecture halls and dining facilities along with new housing for 2,000 undergraduates. A craft center will have a public-use gallery space and community-led classes and events. An auditorium will seat 600 in a concert-caliber structure.

The student housing will be ready for fall 2020, with the academic programs space completed by the end of the year.

The project is pursuing Platinum LEED certification. The contractor is Clark Construction. A February 2020 drone flyover video of the project is available on YouTube.

Rendering of Future College

The second neighborhood, Future College, is also designed to accommodate residential life for 2,000 undergraduate students as well as academic space for a new undergraduate college. According to the university, the project will also improve the university's theatre district with meeting space, retail, dining, underground parking for 1,200 cars and a significant amount of open space and outdoor gathering areas, some with ocean views.

The project is pending UC Regent approval, with the goal of opening in the fall of 2023 as the university's eighth college.

That campus would feature five buildings ranging in height from nine to 21 stories with about 900,000 gross square feet. The contractor is Kitchell. If approved, construction was expected to begin in fall 2020 with completion in fall 2023.

The university will pursue Gold LEED certification for Future College. Sustainability measures include the use of natural ventilation, drought-resident landscaping, high-efficiency features, high-performance HVAC, low-power density lighting, an anaerobic digester system for treating sewage and a photovoltaic array for solar power production.

The projects are intended to keep pace with institutional enrollment, which was 30,000 for the 2018-2019 academic year but was expected to grow to about 42,000 in five years, according to reporting by the San Diego Union-Tribune. That story quoted Chancellor Pradeep Khosla as saying that although the number of students living in dorms this fall could drop by 2,000 due to changes driven by the coronavirus, he expected the downturn to be temporary.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Allegion US Partners with Two Colleges for Mobile Credential Technology

    Allegion US recently announced a partnership with Florida Institute of Technology (FIT) and Denison College, in conjunction with Transact + CBORD, to install mobile credential technologies campus-wide, according to a news release. Implementing Mobile Student ID into Apple Wallet and Google Wallet will allow students access to campus facilities, amenities, and residence halls using just their phones.

  • Lewis C. Cassidy Elementary School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Lewis C. Cassidy Elementary School has been recognized with an EDS 2025 Grand Prize award in the category of New Construction.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

  • Designing School Spaces for A++ Performance

    In recent years, the educational world has gained greater appreciation for the ways a space’s aesthetics, just like its acoustics, can positively impact educational outcomes. Consequently, engineering, designing, and constructing a school environment demands acoustics to be equally an art and a science, requiring architects and designers to see with their ears, while acousticians must hear with their eyes.

Digital Edition