College of the Redwoods Approves Solar Deal

A community college in northern California has projected a savings of $4.2 million over the next 20 years from an implementation of solar. The College of the Redwoods Board of Trustees recently approved a proposal from ForeFront Power to install a 2.1 megawatt system and 500 kilowatt battery storage unit. The implementation will cover about three acres of open field on the campus, a third of the campus parking and the roof of a learning resource center.

College of the Redwoods

When fully deployed, the solar power will provide about 90 percent of the power needed by the Eureka-based main campus. Construction will start after a feasibility study by utility PG&E is completed. That's expected to take about a year. Installation will take an additional three months.

The deal eliminates capital outlay. Forefront will design, construct, own, operate and maintain the grid. The college will buy its power from the company for a flat rate for the next two decades. At that point, the college district will take ownership of the system.

The agreement includes a performance guarantee. Should there be any period when the grid fails to generate sufficient power to meet the 90 percent threshold and the college has to buy additional power from PG&E, ForeFront will cover the difference in pricing.

The school also hopes to make the grid a "living lab" as part of its Solar Technology program, with students serving internships and getting fellowships. ForeFront will also give the school renewable education resources.

"The number of jobs in solar energy is rising exponentially in California, and this project will give our students real-word insight into the knowledge and skills necessary to excel in this growing field," said Kerry Mayer, the college's dean of career education, in a statement.

"Our trustees know that expanding the use of solar power will not only provide a reliable energy source for the campus and a platform for additional academic programming, but it will also help mitigate the problems associated with climate change," added President Keith Flamer.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.