College of the Redwoods Approves Solar Deal

A community college in northern California has projected a savings of $4.2 million over the next 20 years from an implementation of solar. The College of the Redwoods Board of Trustees recently approved a proposal from ForeFront Power to install a 2.1 megawatt system and 500 kilowatt battery storage unit. The implementation will cover about three acres of open field on the campus, a third of the campus parking and the roof of a learning resource center.

College of the Redwoods

When fully deployed, the solar power will provide about 90 percent of the power needed by the Eureka-based main campus. Construction will start after a feasibility study by utility PG&E is completed. That's expected to take about a year. Installation will take an additional three months.

The deal eliminates capital outlay. Forefront will design, construct, own, operate and maintain the grid. The college will buy its power from the company for a flat rate for the next two decades. At that point, the college district will take ownership of the system.

The agreement includes a performance guarantee. Should there be any period when the grid fails to generate sufficient power to meet the 90 percent threshold and the college has to buy additional power from PG&E, ForeFront will cover the difference in pricing.

The school also hopes to make the grid a "living lab" as part of its Solar Technology program, with students serving internships and getting fellowships. ForeFront will also give the school renewable education resources.

"The number of jobs in solar energy is rising exponentially in California, and this project will give our students real-word insight into the knowledge and skills necessary to excel in this growing field," said Kerry Mayer, the college's dean of career education, in a statement.

"Our trustees know that expanding the use of solar power will not only provide a reliable energy source for the campus and a platform for additional academic programming, but it will also help mitigate the problems associated with climate change," added President Keith Flamer.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.