Nebraska HS Begins Renovations for Industrial Arts Technology Center

Renovations to make way for a new industrial arts technology center began at Blair High School, reports the Pilot-Tribune & Enterprise.

The updated facility will house a welding lab identical to one at Metropolitan Community College, fostering a partnership between the high school and community college. High school students will be able to take college/dual credit courses in welding, manufacturing and computer programming, at no cost to the district.

The 14,000-square-foot renovation includes a construction science lab, manufacturing lab, automotive lab, art room, and computer science and robotics lab. The original building was completed in 1970.

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Utah Valley University Opens New Engineering Building

    Utah Valley University in Orem, Utah, recently held a grand-opening ceremony for the new Scott M. Smith Engineering Building, according to a news release. The facility is one of the largest engineering buildings in the state at almost 200,000 square feet, and it plays home to the university’s Smith College of Engineering and Technology (SCET).

  • 144-Year-Old High-School Campus Debuts New Academic Facility

    San Diego High School (SDHS) in San Diego, Calif., recently held a ribbon-cutting ceremony for a new student services and classroom building; the project is part of a larger SDHS Whole Site Modernization project that began in 2022.