UPenn Library Transforms into High-Tech Hub

The University of Pennsylvania in Philadelphia, Pa., is in the process of revamping its outdated biomedical library into what a press release calls “an open center for cross-disciplinary learning, prototyping, and collaboration.” The university is working with Voith and Mactavish Architects LLP (VMA) to finish the renovations by June 2021 and open the building to students for the fall 2021 academic semester.

The new library space, the Biotech Commons, trades stacks of dusty bookshelves and abandoned cubicles for more modern research tools including tech-integrated conference spaces, a digital fabrication lab with 3D printers, and collaboration classrooms with movable furniture. The library’s location among several university schools (like the schools of nursing, sciences, medicine, and engineering) gives it the ideal opportunity to serve students all over campus, no matter their needs or area of study.

University of Pennsylvania Biotech Commons

“The idea of a library as a quiet, formal space for reference is out-of-step with the future of learning,” said Sennah Loftus, VMA associate principal and the project’s lead designer. “We thought of Biotech Commons as a hub—a truly active place where engineers can come in and talk with the Medical Group over lunch, or industry leaders can meet with students to prototype a new idea together in the fabrication lab.”

Any enrolled student at the school is free to reserve any of the facility’s workspaces, from study rooms to the fabrication shop. The library also doesn’t require a student ID to enter the building, making it accessible to business professionals and the community at large.

Other renovations to the building include replacing its brick façade with floor-to-ceiling windows, opening the once-dark and dingy ground-level lobby to natural light. Both public and private group workspaces are scattered throughout the building, making impromptu meetings or study sessions as easy as finding a place to sit down. A large reading room can be converted into a gathering space that can accommodate up to 80 people.

The building was also designed with durability, ease-of-maintenance, and environmental friendliness in mind with the goal of lowering the facility’s carbon footprint—and its operating costs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Beeville ISD Starts Construction on New Elementary School

    The Beeville Independent School District near Corpus Christi, Texas, recently began a construction project that will consolidate two existing, aging schools into a new elementary school, according to a news release. The district is partnering with Pfluger Architects and Spawglass General Contractors for the design and construction, respectively, of the new facility.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • University of Kentucky Integrates New Cleaning Technology

    The University of Kentucky in Lexington, Ky., recently installed a new cleaning system designed to improve cooling efficiency on campus, according to a news release. The Facilities Management’s Utilities and Energy Management Unit installed new chiller tubes into two of the chillers at the university’s Central Utility Plant.

  • California High School Debuts $35M Performing Arts Center

    Irvine High School in Irvine, Calif., recently opened its new Performing Arts Center built in partnership with C.W. Driver Companies, according to a news release. The facility cost $35 million and covers about 25,000 square feet.