UPenn Library Transforms into High-Tech Hub

The University of Pennsylvania in Philadelphia, Pa., is in the process of revamping its outdated biomedical library into what a press release calls “an open center for cross-disciplinary learning, prototyping, and collaboration.” The university is working with Voith and Mactavish Architects LLP (VMA) to finish the renovations by June 2021 and open the building to students for the fall 2021 academic semester.

The new library space, the Biotech Commons, trades stacks of dusty bookshelves and abandoned cubicles for more modern research tools including tech-integrated conference spaces, a digital fabrication lab with 3D printers, and collaboration classrooms with movable furniture. The library’s location among several university schools (like the schools of nursing, sciences, medicine, and engineering) gives it the ideal opportunity to serve students all over campus, no matter their needs or area of study.

University of Pennsylvania Biotech Commons

“The idea of a library as a quiet, formal space for reference is out-of-step with the future of learning,” said Sennah Loftus, VMA associate principal and the project’s lead designer. “We thought of Biotech Commons as a hub—a truly active place where engineers can come in and talk with the Medical Group over lunch, or industry leaders can meet with students to prototype a new idea together in the fabrication lab.”

Any enrolled student at the school is free to reserve any of the facility’s workspaces, from study rooms to the fabrication shop. The library also doesn’t require a student ID to enter the building, making it accessible to business professionals and the community at large.

Other renovations to the building include replacing its brick façade with floor-to-ceiling windows, opening the once-dark and dingy ground-level lobby to natural light. Both public and private group workspaces are scattered throughout the building, making impromptu meetings or study sessions as easy as finding a place to sit down. A large reading room can be converted into a gathering space that can accommodate up to 80 people.

The building was also designed with durability, ease-of-maintenance, and environmental friendliness in mind with the goal of lowering the facility’s carbon footprint—and its operating costs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Lawrence Group Announces Expansion of Student Housing Studio

    Integrated planning and design firm Lawrence Group recently announced that it has hired Nick Naeger, AIA, as the new Associate Principal / Senior Project Manager at its headquarters in St. Louis, Mo., according to a news release.

Digital Edition