Texas High School Completes Campus Expansion Project

Lake Highlands High School, located in Richardson, Texas, announced this week that it has completed a campus expansion and renovation project. The work was done by Cadence McShane Construction and includes updates to multiple school facilities.

In a press release, Cadence McShane Construction listed the work that has been finished, including:

  • A 144,000-square-foot addition connecting the freshman center with the rest of the high school, including an expanded cafeteria, kitchen, common space and library.
  • A multipurpose activity center with a 78,000-square-foot practice facility (including an 80-yard practice field) and a 24,000-square-foot addition for offices, locker rooms, and support areas.
  • New general classrooms, science classrooms, ART Labs, and SPED classrooms repurposed from the former cafeteria and library spaces.
  • A two-story ICF storm shelter that also acts as a weight room, wrestling room, and locker room.

The project, designed by HKS, found its funding from a bond approved by voters in 2016. That bond allowed for $107 million in capacity, construction and renovation projects across the entire Richardson Independent School District (RISD) and $114 million in sports-related improvements, additions, and enhancements.

“Having the opportunity to renovate Lake Highlands High School and be able to give them the facilities that thye need to grow was exciting,” said Will Hodges, Cadence McShane Construction president. “We are proud to have had the opportunity to foster our relationship further with RISD and HKS on this project.”

Cadence McShane and RISD have partnered on 19 separate projects in the last 20 years.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition