P.K. Yonge Middle-High School Construction Complete

SchenkelShultz Architecture announced this week that construction of the Middle-High School at the P.K. Yonge Developmental Research School in Gainesville, Fla., is complete. The public, K–12 school was designed to meet the LEED Gold Certification standard as set by the U.S. Green Building Council.

Affiliated with the University of Florida College of Education, the school is known for its innovative educational curricula and programs that provide each student with an optimized learning experience and environment. The facility was also awarded first place in the Architectural Showcase presented by the Florida Education Facilities Planners’ Association (FEFPA).

P.K. Yonge Developmental Research School

“Our goal was to design a physical environment that was an embodiment of the school’s mission to ‘design, test and disseminate innovations in education,’” said J. David Torbert, partner with SchenkelShultz Architecture. “We collaborated closely with P.K. Yonge’s Leadership Team, educators and students to create a new building that prioritizes active, participatory learning within a safe and secure environment.”

The three-story building was designed to create a student-centered, flexible, and technology-rich learning environment that fosters collaboration. It features amenities like STEM labs, open collaboration areas, distance-learning labs, open collaboration spaces, and break-out spaces for small groups. It was built to replace an existing, 60-year-old facility.

The construction manager for the project was Parrish McCall Constructors.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition