MasterLibrary Announces Interactive Floor Plan Tool

Facility management application solutions provider MasterLibrary recently added a new product to its collection of K–12 solutions. ML Drawings, an interactive floor plan tool, lets users add building assets represented by digital icon stamps to digital floor plans of educational facilities. Each stamp contains further information about the asset being placed.

“We are excited about the launch of ML Drawings and the capabilities it now gives facility professionals,” said Tom Rauscher, MasterLibrary President. “For our users to easily create a digital version of their building through the use of ML Drawings, it will make it easier for the facility departments to view their assets and be more efficient at maintaining them.”

Facility professionals can either map the building’s assets themselves or allow third-party contractors to use ML Drawings during survey work. Other capabilities include two-way integration with ML Work Orders, MasterLibrary’s work order system. Users can schedule work orders or preventative maintenance straight through the asset stamp, as well as access further information about that specific asset.

ML Drawings was released on April 26, 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.