MasterLibrary Announces Interactive Floor Plan Tool

Facility management application solutions provider MasterLibrary recently added a new product to its collection of K–12 solutions. ML Drawings, an interactive floor plan tool, lets users add building assets represented by digital icon stamps to digital floor plans of educational facilities. Each stamp contains further information about the asset being placed.

“We are excited about the launch of ML Drawings and the capabilities it now gives facility professionals,” said Tom Rauscher, MasterLibrary President. “For our users to easily create a digital version of their building through the use of ML Drawings, it will make it easier for the facility departments to view their assets and be more efficient at maintaining them.”

Facility professionals can either map the building’s assets themselves or allow third-party contractors to use ML Drawings during survey work. Other capabilities include two-way integration with ML Work Orders, MasterLibrary’s work order system. Users can schedule work orders or preventative maintenance straight through the asset stamp, as well as access further information about that specific asset.

ML Drawings was released on April 26, 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • CSU Starts Construction on New Engineering Building

    Colorado State University in Denver, Colo., recently began clearing space for the construction of the new Don and Susie Law Engineering Future Technologies Building, according to a news release.

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.