Schneider Electric, School District Partner for Modernization Project

Energy and sustainability solutions company Schneider Electric announced this week that it is partnering with Gulf Shores City Schools in Gulf Shores, Ala., on a system-wide modernization project. The project’s goals are to boost district sustainability and energy efficiency, increase student engagement, and boost opportunities for STEM education. The program is slated to reduce the district’s energy consumption by 33 percent across the next 20 years for a projected savings of about $6.4 million.

“Providing a safe, healthy and enjoyable indoor and outdoor learning environment for our students and teachers is among our top priorities,” said Dr. Matt Akin, Gulf Shores City Schools Superintendent. “We’re thrilled to partner with Schneider Electric to not only make much-needed upgrades to our buildings, but also to do it in an innovative way that boosts critically important STEM learning while saving us money for future improvements.”

According to a press release, improvements to district facilities include:

  • New HVAC systems
  • New, more sustainable water systems to reduce energy & water consumption
  • Roof replacement at the district’s high school
  • A new centralized building automation system at each school in the district
  • Interior and exterior LED lighting upgrades
  • Solar skylights to increase daylighting
  • A Voiceover IP (VoIP) phone system to decrease emergency response times

The project also includes the construction of interactive learning areas in all three of the district’s schools. These include a renewable energy generation area with interactive dashboards displaying real-time data about energy production and usage; a system of SmartFlower solar arrays; the installation of solar-powered trees; other solar-powered technology like solar benches and charging stations; and a variety of teaching exhibits.

The modernization work will be paid for in part by federal funds provided by the American Rescue Plan.

“We are proud to partner with Gulf Shores City Schools on innovative solutions that provide a health, safe and sustainable learning environment,” said Tammy Fulop, Vice President of Schneider Electric. “As districts struggle to do more with less, we are excited to help GSCS become a leading example of how to address top priorities and create a state-of-the-art campus while saving money for future upgrades.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Epson Receives Seven AV Industry Awards

    Projectors manufacturer Epson recently announced that it received multiple awards across the Higher Ed AV Awards, SCN Stellar Service Awards, and InfoComm 2025, according to a news release. The company was recognized for three projectors from its PowerLite L-Series line, accessories, installation process, and its customer support team.

  • Photo courtesy of Spiezle Architectural Group, Inc.

    West Melbourne School for Science Completes Expansion Project

    The West Melbourne School for Science, which serves students grades PreK–6 in West Melbourne, Fla., recently completed a 12,450-square-foot elementary school expansion, according to a news release.

  • Ancient Resilience: How Indigenous Intelligence Shapes the 4Roots Education Building

    As climate change intensifies, educational spaces must evolve beyond basic sustainability toward true resilience – we must design environments that can adapt, respond, and thrive amid shifting, and intensifying, climate hazards. Drawing on indigenous wisdom and nature-based strategies, integrating resilient design offers a path to create learning environments that are not only functional but deeply in tune with their natural surroundings.

  • Case Study Highlights Texas District’s Campus Security Upgrades

    The Taft Independent School District near Corpus Christi, Texas, recently partnered with Intech Southwest Services to revamp its campus security technology system, according to a news release. Intech has released a case study on its website detailing the process that advanced the district’s technology by more than 20 years in less than three weeks.

Digital Edition