Pennsylvania High School to Undergo $17.4M Traffic Flow Upgrade

Hampton High School, located near Pittsburgh, Pa., will see a major redesign of its parking lots and surrounding access roads later this year. The goal of the construction project is to improve and streamline the flow of traffic for the safety of students, faculty, and the surrounding community.

The renovations have been in the works for several years, according to Superintendent Michael Loughead. Specific tasks include reconfiguring the school’s parking areas, adding a second entrance off of nearby Topnick Drive, two building additions, and upgrades to lighting and landscaping. The total cost of the project is estimated at $17.4 million.

“The bus, car and pedestrian traffic will be separated, and student dropoff will occur at a safe location,” said Chris Brown, senior architect with VEBH Architects. “Vehicle circulation will be clearer than the current arrangement, and the areas of failing paving and sidewalks will be replaced.”

The project is slated to take about 18 months and will be done in phases to minimize disruptions to campus proceedings. Construction on the building addition, which will house an upgraded media center, will begin by the end of the summer. Another new facility includes a 2,400-square-foot storage garage measuring 40 by 60 feet that will house lawn and maintenance equipment.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition