Pennsylvania High School to Undergo $17.4M Traffic Flow Upgrade

Hampton High School, located near Pittsburgh, Pa., will see a major redesign of its parking lots and surrounding access roads later this year. The goal of the construction project is to improve and streamline the flow of traffic for the safety of students, faculty, and the surrounding community.

The renovations have been in the works for several years, according to Superintendent Michael Loughead. Specific tasks include reconfiguring the school’s parking areas, adding a second entrance off of nearby Topnick Drive, two building additions, and upgrades to lighting and landscaping. The total cost of the project is estimated at $17.4 million.

“The bus, car and pedestrian traffic will be separated, and student dropoff will occur at a safe location,” said Chris Brown, senior architect with VEBH Architects. “Vehicle circulation will be clearer than the current arrangement, and the areas of failing paving and sidewalks will be replaced.”

The project is slated to take about 18 months and will be done in phases to minimize disruptions to campus proceedings. Construction on the building addition, which will house an upgraded media center, will begin by the end of the summer. Another new facility includes a 2,400-square-foot storage garage measuring 40 by 60 feet that will house lawn and maintenance equipment.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Armstrong World Industries Acquires Geometrik

    Armstrong World Industries, designer and manufacturer of interior and exterior architectural applications like ceilings, walls, and metal solutions, recently announced its acquisition of Canada-based Geometrik, according to a news release. The British Columbian Geometrik specializes in designing and manufacturing wood acoustical and wall systems.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

Digital Edition