Gonzaga University Names New Integrated Science and Engineering Facility

Gonzaga University in Spokane, Wash., announced this week that it has named its new Integrated Science and Engineering facility: The John and Joan Bollier Family Center for Integrated Science and Engineering is scheduled to open this fall. The Bollier family, from Newberg, Ore., provided a significant donation for the construction of the $49.7-million facility.

“The Bollier family exemplifies the values, commitment, and spirit of this community. John, Joan, Brett, Emily, and Nolan’s thoughtful and generous leadership makes a significant difference in ensuring the University delivers on this mission,” said Gonzaga President Thayne M. McCulloh, D.Phil. “Because of the Bolliers, Gonzaga’s commitment to Jesuit STEM education and research will have an impact on the Inland Northwest and beyond for generations to come. I am truly thankful for the support and Zag spirit with which they show up each day.”

According to a press release, in September, faculty and staff will move into their offices and common areas, study spaces and labs will open to students. Classes are scheduled to begin in the spring 2022 semester. The 82,000-square-foot space will focus on STEM education at Gonzaga and place a special emphasis on cross-disciplinary collaboration. The building will feature skybridges connecting it to the PACCAR Center for Applied Science and to the College of Arts and Sciences’ chemistry and biology departments in Hughes Hall.

According to a brochure on the university website, the new facility will increase the university’s STEM space by 44% and add 18 new labs, including a Psych Suite, a math lab, an innovation lab, a circuits lab, technology and engineering labs, student project wet & dry labs, a dynamics & vibration lab, an innovation studio, and more.

The project’s lead architect is SRG Partnership Inc. of Portland, Ore., partnering with Integrus Architecture of Spokane, Wash.; Research Facilities Design of San Diego, Calif.; MW Engineers of Spokane; and DCI Engineers of Spokane.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Los Angeles City College Breaks Ground on New Administration, Workforce Building

    Los Angeles City College (LACC) in Los Angeles, Calif., recently broke ground on a new $72-million administrative facility, according to a news release. The Cesar Chavez Administration and Workforce Building will stand four stories, cover 67,230 square feet, and play home to a wide variety of the school’s educational and administrative services.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

Digital Edition