Golden West College Starts Construction on Language Arts Complex

Construction on a new language arts complex recently began at Golden West College in Huntington Beach, Calif. The college is partnering with Sundt Construction, Inc., on the facility.

“We are excited to continue working on the Golden West campus,” said John Messick, Sundt’s Project Director for the California District Building Group. “Building infrastructure to support remote, in-person or hybrid learning is critical to the success of today’s students.”

The new complex will measure in at 72,251 square feet and stand three stories tall, featuring classrooms and a large reading, writing and resource center. The facility will house lecture spaces for the college’s world languages, ASL, English and speech programs. Other amenities will include gathering, office and support spaces; natural daylighting fixtures; modern LED fixtures; HVAC improvements; and native landscaping.

Project architect HMC designed the complex as two wings connected by a second- and third-floor internal bridge. “Guided by the principle of ‘connection,’ we designed the building to not only connect with the campus aesthetic, but also to provide opportunities for students to connect with campus touchpoints and classmates,” said HMC Design Principal Brett Leavitt.

The HMC Architects’ website also notes that design strategies like natural daylighting and native landscaping give the complex a head start on becoming a Zero Net Energy Building.

The first step of the construction process was the demolition of the long-standing humanities building and health sciences facility. Construction is scheduled for completion by the end of 2021.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • LSU Breaks Ground on $200M Residential Project

    Louisiana State University in Baton Rouge, La., recently broke ground on a new residential complex, according to university news. The South Quad residential project will consist of two buildings and add a total of 1,266 beds for freshmen students. The development comes with a price tag of $200 million, and it’s scheduled to open to students in fall 2027.

  • New City School

    Turning Crisis into Opportunity: Transforming New City School

    When New City School in St. Louis suffered catastrophic flood damage in July 2022, the event could have marked a serious setback for the 100-year-old institution. Instead, it became a forward-looking opportunity.

  • iPark 87

    Building a Future-Focused Career and Technical Education Center

    A district superintendent shares his team's journey to aligning student passions with workforce demands, and why their new CTE center could be a model for districts nationwide.

Digital Edition