Chicago Private School Breaks Ground on $25.7M Performing Arts Center

Loyola Academy, a private Jesuit college preparatory school in Wilmette, Ill., recently broke ground on a brand-new, 29,000-square-foot performing arts center. The Loyola Academy Center for the Performing Arts comes with a $25.76-million price tag and will feature flexible indoor and outdoor performance spaces. The project was designed by Chicago-based Krueck Sexton Partners (KSP).

“In our conversations with Loyola leadership, it became clear that we are working with a client who is seeking transformational change, the DNA of the Jesuit experience,” said Tom Jacobs, AIA, LEED AP, co-managing partner at KSP. “It was critical for Loyola to strengthen the fine arts on campus, and to elevate it to equal standing with academics and sports. The theater acts as a connector that extends cross-campus circulation, and the new quad will function as a campus ‘town square.’”

The facility will feature amenities like a 125-foot, curved glass wall to blend the indoor and outdoor spaces; a 565-seat proscenium theater with a balcony, fly tower, orchestra pit, and lighting technology; a rehearsal and staging area; a scene shop; a green room, makeup room, and dressing rooms; and a student lounge area.

Loyola Academy Center for the Performing Arts
Photo courtesy of Krueck Sexton Partners (KSP)

Students in the school’s American Institute of Architects (AIA) student chapter played a fundamental role in the planning and design process. Community stakeholders, parents, and donors were also given the chance to engage and give feedback. The all-electric building was designed with sustainability goals in mind, aligning with the Chicago area’s transition to all-renewable fuel sources by 2035. The facility will leave room for the anticipated installation of a rooftop photovoltaic array capable of powering the entire building.

“True leadership in education considers the wellbeing of all, far into the future,” said Sara Lundgren, AIA, LEED AP, project director and partner at KSP. “As a high-performing building that uses 58 percent less energy when compared against the local average of peer institutions, the theater is a testament to the ‘be more’ ethos that pervades Loyola Academy. It is a building that future Ramblers will look to and recognize that they are part of a group of people who literally practice what they preach.”

Construction is scheduled for completion in 2022. The project’s general contractor is Valenti Builders. Other project partners include Coen Partners (landscape architects), A10 (sustainability consultant), Schuler Shook (theater designer and lighting design), and ESD (mechanical / electrical / plumbing engineer).

“Since the first Jesuit school opened nearly five centuries ago, we have understood that the arts play an important role in the enrichment of the human spirit and the development of creative thinkers with the potential to transform society in positive ways,” said Rev. Patrick E. McGrath, SJ, president of Loyola Academy. “Our new performing arts center represents a long-anticipated expansion of resources and facilities that will benefit all Loyola students and expand access to a broader network of our community partners, neighbors and friends.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition