Chicago Private School Breaks Ground on $25.7M Performing Arts Center

Loyola Academy, a private Jesuit college preparatory school in Wilmette, Ill., recently broke ground on a brand-new, 29,000-square-foot performing arts center. The Loyola Academy Center for the Performing Arts comes with a $25.76-million price tag and will feature flexible indoor and outdoor performance spaces. The project was designed by Chicago-based Krueck Sexton Partners (KSP).

“In our conversations with Loyola leadership, it became clear that we are working with a client who is seeking transformational change, the DNA of the Jesuit experience,” said Tom Jacobs, AIA, LEED AP, co-managing partner at KSP. “It was critical for Loyola to strengthen the fine arts on campus, and to elevate it to equal standing with academics and sports. The theater acts as a connector that extends cross-campus circulation, and the new quad will function as a campus ‘town square.’”

The facility will feature amenities like a 125-foot, curved glass wall to blend the indoor and outdoor spaces; a 565-seat proscenium theater with a balcony, fly tower, orchestra pit, and lighting technology; a rehearsal and staging area; a scene shop; a green room, makeup room, and dressing rooms; and a student lounge area.

Loyola Academy Center for the Performing Arts
Photo courtesy of Krueck Sexton Partners (KSP)

Students in the school’s American Institute of Architects (AIA) student chapter played a fundamental role in the planning and design process. Community stakeholders, parents, and donors were also given the chance to engage and give feedback. The all-electric building was designed with sustainability goals in mind, aligning with the Chicago area’s transition to all-renewable fuel sources by 2035. The facility will leave room for the anticipated installation of a rooftop photovoltaic array capable of powering the entire building.

“True leadership in education considers the wellbeing of all, far into the future,” said Sara Lundgren, AIA, LEED AP, project director and partner at KSP. “As a high-performing building that uses 58 percent less energy when compared against the local average of peer institutions, the theater is a testament to the ‘be more’ ethos that pervades Loyola Academy. It is a building that future Ramblers will look to and recognize that they are part of a group of people who literally practice what they preach.”

Construction is scheduled for completion in 2022. The project’s general contractor is Valenti Builders. Other project partners include Coen Partners (landscape architects), A10 (sustainability consultant), Schuler Shook (theater designer and lighting design), and ESD (mechanical / electrical / plumbing engineer).

“Since the first Jesuit school opened nearly five centuries ago, we have understood that the arts play an important role in the enrichment of the human spirit and the development of creative thinkers with the potential to transform society in positive ways,” said Rev. Patrick E. McGrath, SJ, president of Loyola Academy. “Our new performing arts center represents a long-anticipated expansion of resources and facilities that will benefit all Loyola students and expand access to a broader network of our community partners, neighbors and friends.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • DLR Group Appoints New K–12 Education Practice Leader

    Integrated design firm DLR Group recently announced that it has named its new global K–12 Education leader, Senior Principal Carmen Wyckoff, AIA, LEED AP, according to a news release. Her teams have members in all 36 of the firm’s offices in the U.S., Puerto Rico, the U.S. Virgin Islands, Europe, and Asia.

  • South Texas K–12 District Debuts Region’s First Electric Bus Fleet

    The Valley View Independent School District in Pharr, Texas, recently announced a partnership with Highland Electric Fleets to launch the district’s—and the region’s—first fleet of all-electric school buses, according to a news release.

  • UCNJ Launches $30M Modernization of Physical Education Center

    The Union College of Union County (UCNJ) in Cranford, N.J., recently broke ground on a new $30-million modernization project for its Physical Education Center (PECK), according to a news release. The college partnered with DIGroup Architecture for the project’s design, transitioning the existing 42,000-square-foot structure into a campus hub for student athletics and campus life.

  • Longwood University Selects Builder for $73M Performing Arts Center

    Longwood University in Farmville, Va., recently announced that it has selected Swedish construction company Skanska as the builder of its new performing arts center, according to online news. The project involves the demolition of the current building and constructing a new, 64,500-square-foot facility.

Digital Edition