University of Arizona Breaks Ground on $85M Research Facility

The University of Arizona in Tucson, Ariz., recently broke ground on a new Applied Research Building. The three-story, 89,000-square-foot facility will bring together eight departments from four colleges (the College of Engineering, the College of Science, the James C. Wyant College of Optical Sciences and the College of Medicine-Tucson) for a cost of $85 million. The building is expected to open to students by spring 2023.

Amenities within the facility will include a thermal vacuum chamber to simulate space environmental conditions, an anechoic chamber to absorb reflections and electromagnetic waves to test antennas, a high bay lab for high-altitude balloons, and a dynamic testing lab for large objects. The building will not include classroom space, but undergraduate and graduate students are welcome to use the building for research purposes.

“The co-location of multiple, interrelated research programs will create a hub that enables new opportunities for the Fourth Industrial Revolution research that will help the university to recruit and retain recognized faculty, as well as increase federal and industry funding,” said University of Arizona President Robert C. Robbins. “The ARB will focus on expanding several areas of research that have resulted in the university being ranked among the top 100 research institutions in the world.”

The facility will provide space for research projects like nanosatellites that lessen the cost of going to space; the UA Imaging Technology Laboratory, featuring advanced sensors for astronomy research, satellite images, and chemical analysis; 3D printing facilities for aerospace parts; and stratospheric balloons for use on earth and, potentially, other planets.

“From the College of Engineering’s perspective, the timing of this building is ideal,” said David Hahn, dean of the College of Engineering. “As we compete with other top universities for talent, like faculty talent and student talent, it’s this type of facility that will allow us to improve those efforts and, in fact, beat out other universities for the very best students and the very best faculty.”

The university is partnering with the McCarthy Building Companies and SmithGroup construction firms for design and construction. The project will also entail realigning the nearby Highland Underpass.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Oregon District Selects Builder for Multiple Renovation Projects

    The David Douglas School District in Portland, Ore., recently selected Balfour Beatty company Howard S. Wright to deliver $15.7 million in renovations and repairs across multiple schools and facilities, according to a news release. The district also partnered with BBL Architects for the projects’ designs.

  • DLR Group Hires New Higher Education Business Development Leader

    Integrated design firm DLR Group recently announced that it has named a new Higher Education Business Development Leader who will serve out of the firm’s New York studio, according to a news release.

  • LocknCharge Launches App-Based Smart Locker System

    LocknCharge, a developer of mobile phone charging, storing, security, and technology management solutions, recently launched the new FUYL Enhanced Smart Locker System, according to a news release. The app-based kiosk allows self-serve access to devices while also providing full security and control.

  • Case Systems makerspace

    Case Systems Launches Line of K–12 Learning Spaces Installations

    Case Systems recently announced the launch of SALTO, a line of classroom fixtures and installations for K–12 learning spaces like STEM labs, art rooms, and makerspaces, according to a news release. The product line is designed to provide teachers with flexibility and adaptability, enabling them to shift between collaborative and individual learning environments.

Digital Edition