Mass. Town Breaks Ground on $60M Elementary

Groundbreaking has taken place on a new elementary school in Amesbury, Mass. Construction of the Sgt. Jordan Shay Memorial Lower Elementary School was approved by city residents in 2019. The $60-million facility will sit next to the Cashman Elementary School, creating a two-building campus where students in preK–2 will attend the new school and students in grades 3–5 will attend Cashman.

The school is intended to use green design principles, with a projected savings of 28% in site energy use and 35% in reduced water use.

Project management is being handled by NV5. DiNisco Design is serving as architect for the building. The construction contract was awarded to CTA-Construction Managers. Civil engineering is being done by DGT Associates. And Brown + Sardina was named landscape architect. All are Massachusetts-based companies.

Sgt. Jordan Shay Memorial Lower Elementary School

The facility is being named after Jordan Shay, who grew up in Amesbury and died in Iraq during his second deployment. According to a foundation that was formed under his name, Shay specified in a "just in case letter" that if something were to happen to him, he wanted a scholarship fund to be started for students who "want to make a difference in the world." The foundation is led by Shay's mother, Holly.

Construction is expected to be done in March 2023.

Amesbury has posted all documents related to the project on a city website.

About the Author

Dian Schaffhauser is a former senior contributing editor for 1105 Media's education publications THE Journal, Campus Technology and Spaces4Learning.

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Photo courtesy of Kraus-Anderson

    Minnesota District Completes $49.7M Addition, Renovation Project

    St. Paul Public Schools in St. Paul, Minn., recently announced the completion of a $49.7-million addition and remodeling project at two district schools, according to a news release.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.