Campus Cleanliness Emerges as Top Factor in College Selection

The results of a new survey from JLL have revealed that campus cleanliness and indoor air quality now rank among the top factors in college selection. JLL, a Fortune 200 commercial real estate and professional services firm, surveyed about 500 parents of tenth- through twelfth-grade students about their priorities while considering higher education destinations. The top three most important factors, according to the results, were quality of academics (75%), affordability (71%) and—in the wake of the COVID-19 pandemic—campus cleanliness and indoor air quality (48%).

Additionally, the survey indicated that about 59% of parents had never considered campus air quality as a decision-making factor before the pandemic, while 60% said they consider a vaccine mandate important. About 21%, meanwhile, said they would consider a school’s sustainability initiatives.

“Proper indoor ventilation and air circulation occupied the spotlight across most industries in the height of the pandemic, with 59 percent of parents never even considering campus air quality prior to COVID-19,” said Ron Gregory, Executive Vice President North America, JLL Higher Education. “As people are more aware of their surroundings that impact their health and safety with greater reason, we can expect that students and staff on campuses will continue to demand transparency and the highest standards around cleanliness and air quality.”

Among the survey’s other findings, 42% of respondents said that their opinion of campus cleanliness and air quality had changed due to the pandemic. About 88% said that the physical condition of buildings was either very important or somewhat important, and 86% said that they consider a campus’s look and feel.

“From simple fixes like upgrading lightbulbs to harnessing new technologies across a campus, preventative maintenance is key for schools empowering vibrant campus experiences—before the physical condition of buildings becomes a turn-off to prospective students,” said Kevin Wayer, President, JLL Public Institutions. “Savings generated from preventative maintenance can go back into facilities upkeep, creating an overall better, cleaner and more modern experience for students.”

The survey was conducted in June 2021 through a partnership with Engine Insights.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Missouri State University Debuts Construction Education Center

    Missouri State University in Springfield, Mo., recently opened a new 10,000-square-foot addition and renovation to support the School of Construction, Design, and Project Management, according to university news. The Construction Education Success Center, built onto the existing Kemper Hall, provides academic space for the school’s construction managers and cost $9.6 million.

  • How One School Reimagined Learning Spaces—and What Others Can Learn

    When Collegedale Academy, a PreK–8 school outside Chattanooga, Tenn., needed a new elementary building, we faced the choice that many school leaders eventually confront: repair an aging facility or reimagine what learning spaces could be. Our historic elementary school held decades of memories for families, including some who had once walked its halls as children themselves. But years of wear and the need for costly repairs made it clear that investing in the old building would only patch the problems rather than solve them.

  • Extron, CENTEGIX Partner for Comprehensive School Security Solution

    Professional audiovisual solutions provider Extron recently announced a partnership with CENTEGIX, which provides rapid incident response technology, to integrate two of their top products in the name of school safety.

  • North Dakota State University Completes Music School Renovation

    North Dakota State University in Fargo, N.D., recently announced that construction on the Challey School of Music has finished, according to a news release. The university partnered with Foss Architecture & Interiors for design and Kraus-Anderson for construction services, and construction began in July 2024.