Orange County Public Schools Debut Two New High Schools

SchenkelShultz Architecture announced last week that it has completed two new high schools for Orange County Public Schools. Horizon High School and Lake Buena Vista High School, respectively located in the Winter Garden and Dr. Phillips areas of Orange County, Fla., will each include room for 2,700 students in the nation’s eighth-largest school district.

“Our goal in the design of these two campuses was to balance cost efficiency and functionality with a modern, 21st-century learning environment for students,” said David Torbert, Partner and Education Leader at SchenkelShultz. “The multi-use academic spaces support small-scale learning communities, multi-modal instruction, and project-based learning with the courtyard providing a place to extend learning, connection and collaboration beyond the classroom.”

Horizon High School
Photo credit: SchenkelShultz Architecture

According to a news release, both schools feature a centralized courtyard and an auditorium, gymnasium and media center up front for easy after-hours access by students and parents. The administration building offers a single, secure point of entry for each school’s entire campus. Other security features at both campuses include a full security system and cameras, a two-way emergency radio system, a voice-evacuation fire alarm system, fence-lined perimeters, card reader entrance controls, and a permanent generator.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition