Orange County Public Schools Debut Two New High Schools

SchenkelShultz Architecture announced last week that it has completed two new high schools for Orange County Public Schools. Horizon High School and Lake Buena Vista High School, respectively located in the Winter Garden and Dr. Phillips areas of Orange County, Fla., will each include room for 2,700 students in the nation’s eighth-largest school district.

“Our goal in the design of these two campuses was to balance cost efficiency and functionality with a modern, 21st-century learning environment for students,” said David Torbert, Partner and Education Leader at SchenkelShultz. “The multi-use academic spaces support small-scale learning communities, multi-modal instruction, and project-based learning with the courtyard providing a place to extend learning, connection and collaboration beyond the classroom.”

Horizon High School
Photo credit: SchenkelShultz Architecture

According to a news release, both schools feature a centralized courtyard and an auditorium, gymnasium and media center up front for easy after-hours access by students and parents. The administration building offers a single, secure point of entry for each school’s entire campus. Other security features at both campuses include a full security system and cameras, a two-way emergency radio system, a voice-evacuation fire alarm system, fence-lined perimeters, card reader entrance controls, and a permanent generator.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • FAU Starts Construction on Holocaust and Jewish Studies Building

    Florida Atlantic University recently began construction on a new academic building for its campus in Boca Raton, Fla., according to university news. The Kurt and Marilyn Wallach Holocaust and Jewish Studies Building will stand two stories, measure in at 22,000 square feet, and play home to the university’s Holocaust education and Jewish studies programs.

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Zurn Releases New Ductile Iron Frame Trench Drain System

    Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

  • California Boarding School Opens New Inquiry Collaborative Facility

    Cate School, a boarding school in Carpinteria, Calif., for students grades 9–12, recently announced that it has finished renovating a historic dining hall into a new academic hub, according to a news release. The school partnered with Blackbird Architects and Tangram Interiors on the two-story, 16,000-square-foot Inquiry Collaborative.