Columbine High School Debuts Renovations

Columbine High School, located in Littleton, Colo., held a ribbon-cutting ceremony recently for a series of renovations to the campus, including a new entrance. A new outdoor awning provides more privacy than the previous entrance. The campus improvements come just two years after serious consideration was given to the facility’s demolition.

“The school is a model and symbol of resiliency,” said Columbine High School Principal Scott Christy. “It’s a model of what happens when people come together in the face of tragedy and become stronger as a result.” This addition, I think, just shows the strength of this community and this school.”

According to the school’s website, improvements include:

  • Exterior improvements including fresh paint and repairs
  • A new Auxiliary Gym featuring a dance studio
  • Remodels to the interior, including updated weight rooms and locker rooms
  • A new science lab, English classroom, Family and Consumer Science classroom, and a kitchen lab
  • Exterior and interior security improvements
  • Landscaping and athletic field improvements, including new turf and an all-weather track
  • Interior improvements including painting; updating wall coverings; replacing flooring, old furniture, sinks, cabinets and shelves; and replacing ceilings
  • Infrastructure updates including wiring, HVAC, plumbing and pipes, and replacing interior lights with LEDs

According to local news, the high school’s last major renovation was in 1995. The improvements were funded through a district-wide bond.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • A university

    Breaking Higher Education's Billion-Dollar Backlog Problem

    Strategic mechanical system design can transform campus maintenance backlogs. Here's how.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

  • Colorado State University Global, SCTE Launch Online Certificate Program

    Colorado State University Global (CSU Global), based in Denver, Colo., recently announced a partnership with CableLabs subsidiary the Society of Cable Telecommunications Engineers (SCTE) to launch an online certificate training program for broadband professionals, according to a news release.

Digital Edition