Columbine High School Debuts Renovations

Columbine High School, located in Littleton, Colo., held a ribbon-cutting ceremony recently for a series of renovations to the campus, including a new entrance. A new outdoor awning provides more privacy than the previous entrance. The campus improvements come just two years after serious consideration was given to the facility’s demolition.

“The school is a model and symbol of resiliency,” said Columbine High School Principal Scott Christy. “It’s a model of what happens when people come together in the face of tragedy and become stronger as a result.” This addition, I think, just shows the strength of this community and this school.”

According to the school’s website, improvements include:

  • Exterior improvements including fresh paint and repairs
  • A new Auxiliary Gym featuring a dance studio
  • Remodels to the interior, including updated weight rooms and locker rooms
  • A new science lab, English classroom, Family and Consumer Science classroom, and a kitchen lab
  • Exterior and interior security improvements
  • Landscaping and athletic field improvements, including new turf and an all-weather track
  • Interior improvements including painting; updating wall coverings; replacing flooring, old furniture, sinks, cabinets and shelves; and replacing ceilings
  • Infrastructure updates including wiring, HVAC, plumbing and pipes, and replacing interior lights with LEDs

According to local news, the high school’s last major renovation was in 1995. The improvements were funded through a district-wide bond.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition