Greenheck Announces Redesign for Energy Core Ventilator Line

Air movement, control and conditioning solutions company Greenheck announced this week that it has redesigned its Energy Core Ventilator (ECV) line. According to a news release, the upgrade is meant to ensure the best possible unit performance within the smallest available footprint for space-sensitive installations either indoors or outdoors.

The press release states that the new ECV units feature direct drive plenum fans with variable frequency drives (VFDs). The new fans replace the more standard forward-curved fans to reduce motor horsepower requirements and the associated electrical wire and circuit breaker sizes. The VFD facilitates balancing during start-up, and the removal of belts simplifies maintenance procedures. It also features reduce sound power levels as backed by radiated sound data tested in accordance with AMCA 320-07.

Greenheck Energy Core Ventilator ECV 30
Photo courtesy of Greenheck

The ECV line has an airflow capacity of up to 5,000 cfm and comes with an AHRI Certified fiber membrane core or washable polymer core. Other model ECV features include double-wall construction with optional lift-off or hinged access for flexibility during new or retrofit installations. The standalone microprocessor controls allow for the management of downstream electric heaters and heating or cooling coils. Other options include frost, fan speed and economizer controls.

The energy core ventilators were designed for environments like schools, residence halls, hospitals, nursing homes and offices, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition