Minn. District Consolidates All Students into One Facility

Construction company Kraus-Anderson recently announced the completion of a $30-million elementary school in Pipestone, Minn. The facility is an addition to the district’s existing middle and high school building, meaning that the full facility will house all of the district’s 1,150 public school students. About 500 elementary school students had previously been split between two outdated buildings, according to a press release.

The elementary school addition covers 85,940 square feet and serves students in grades preK–5. The two-story facility features amenities like a central visitor entrance for security reasons, a renovated and expanded kitchen and cafeteria, a new gymnasium, flex learning areas, and administration offices. Kraus-Anderson and the school district partnered with ISG Architects for the design process.

Other design features include flexible classroom seating and tables with adjustable heights; tables that students can write on; one flexible learning space per floor, and sensory rooms with adjustable lighting and special equipment.

Voters approved the district bond referendum project in 2019.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition