LPA Design Studios Names New Director of K–12 Practice

Design firm LPA Design Studios recently announced that it has promoted Kate Mraw to the position of Director of K–12. In this new role, Mraw will spearhead the development of the firm’s national education design practice, according to a press release. Mraw joined the firm in 2004 and has worked with education professionals, students and communities to build research-driven, effective and efficient K–12 campuses around the country.

As a principal at LPA, her work includes e3 Civic High School in San Diego, Calif., co-located with a public library; the renovation and preservation of Lanier High School in San Antonio, Texas; and the K-12 Agnews Campus currently under construction in San Jose, Calif. Mraw earned a Bachelor of Science in Interior Design from UT-Austin.

Kate Mraw LPA Design Studios

“Kate’s passion and spirit of collaboration make her the perfect choice to lead our K–12 practice,” said LPA CEO Wendy Rogers. “On every project, regardless of size or budget, she works with communities to develop spaces that empower the learning process.”

Mraw will be taking over the position from Jim Kisel, who’s led the firm’s K–12 design practice for 28 years. A press release notes that the K–12 team has master-planned and designed projects for more than 100 districts and has developed relationships with district professionals all over the U.S. Mraw has worked alongside both Rogers and Kisel on a series of campus projects along the West Coast.

During her time at LPA, Mraw led EDU interiors efforts and launched the firm’s in-house research group, LPAred. “The design process is developed around engagement, programming and understanding how we interact with space,” Mraw said in a press release. “Research is helping us recognize the cues to design better learning environments.”

Mraw also works with organizations like the Coalition for Adequate School Housing (CASH) and the Texas Association of School Administrators. She’s an active member of the Association for Learning Environments (A4LE), serving as a board member of their Central Texas Chapter, and also serves on the University of Texas School of Architecture Advisory Council.

“We are invested in growing our people to grow our practice,” said Mraw. “We want to stay curious and continue to ask better questions that lead to deeper understanding and better solutions.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

Digital Edition