Maryland to See New $180M High School

Montgomery County Public Schools recently approved design plans for a new, $180-million high school in Gaithersburg, Md. Local news reports that Crown High School will stand five stories and have the capacity for about 2,200 students. The design also leaves room for potential expansion to house up to 2,700 students.

The school will include a gymnasium open to the public, dining space, an indoor amphitheater, and space for special education programs. It will also feature a child development program, an administrative sing, a performing arts wing, a media center, and classrooms and lab space. The campus will feature multiple courtyards, and open space accounts for about 65% of the layout, according to Bethesda Magazine. It will also take advantage of sustainability initiatives like solar panels and geothermal energy.

The main purpose of the school’s construction is to ease overcrowding at five other district high schools. The land on which the school will be built is owned by the city of Gaithersburg. The plot has been designated as a future school site since 2006 on the condition that construction had to begin within 20 years, according to an arrangement with the mayor and the City Council.

Construction is scheduled for completion in 2026, although it may stretch into 2027. The district is partnering with general contractor Keller Construction Management and architecture firm Stantec Architecture.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition