Calif. School Debuts New $66.5M Academic Building

California State University, Dominguez Hills (CSUDH), located in Carson, Calif., recently completed construction on its new, $66.5-million Innovation and Instruction Building. The 107,600-square-foot space was designed to support active learning and encourage collaboration among students and faculty, according to a news release. The building stands four stories and features amenities like a 250-seat auditorium, a 120-seat active learning classroom, two case-study rooms with 60 seats each, meeting rooms and computer labs, faculty and administrative office space, and a café.

The university partnered with builder C.W. Driver Companies and architecture firm HGA Architects & Engineers. C.W. Driver completed a Science and Innovation Building for CSUDH in 2019.

California State University Dominguez Hills Innovation Instruction Building
Photo credit: Chase Magdaleno, Drone Works Media

“We have enjoyed our partnership with CSUDH, lending our years of experience constructing projects for California universities to complete another cutting-edge facility designed to support the evolving needs of higher education,” said project executive Tom Jones with C.W. Driver Companies. “With several active learning classrooms and external collaboration areas, interaction and continuous learning are encouraged among students and educators.”

The facility opened for classes in time for the spring 2022 semester. In addition to the services listed above, it also plays home to the College of Business Administration and Public Policy. The building’s second floor includes a simulated trading room featuring lighted ticker tape information.

“The outstanding design and dynamic quality of the Innovation and Instruction Building are ushering in a new era of campus facilities that matches the caliber of the academics taking place,” said Roshni Thomas, director of facilities planning, design and construction at CSUDH. “The C.W. Driver team was an excellent partner in bringing our vision to life, helping us to navigate this challenging period for construction.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • sapling sprouting from a cracked stone

    Lessons in Resilience: Disaster Recovery in Our Schools

    Facility managers play a pivotal role in how well a school weathers and recovers from a crisis. Whether it's a hurricane, a flood, a tornado, or a man-made event, preparation determines resilience.

  • classroom with crystal ball on top of a desk

    Call for Opinions: Spaces4Learning 2026 Predictions for Educational Facilities

    As 2025 winds to a close, the Spaces4Learning staff is asking its readers—school administrators, architects, engineers, facilities managers, builders, superintendents, designers, vendors, and more—to send us their predictions for educational facilities in 2026.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Construction Begins on East Austin CTE-Focused High School

    The Del Valle Independent School District recently announced that construction has begun on a new CTE-focused high school in Austin, Texas, according to a news release. Del Valle High School will measure in at 473,338 square feet and have the capacity for 2,400 students.

Digital Edition